Kaiser Morse Hospital

Over several months, Vista Environmental Consulting, Inc. (Vista) performed an extensive chemical inventory and hazardous materials assessment audit of the occupied hospital and laboratories of the multi-story Kaiser Morse Hospital campus in Sacramento. After an inspection by the Fire Marshal,

Posted in Tagged with: ,

San Antonio Community Hospital

Vista Environmental Consulting (Vista) performed comprehensive hazardous materials surveys for the San Antonio Community Hospital areas to be structurally repaired, renovated, and demolished including the services related to the new wing construction. Hazardous materials abatement consulting from remediation design through

Posted in Tagged with: ,

Corona Regional Medical Center

The Corona Regional Medical Center was mandated to undergo a seismic retrofit as part of regulatory compliance for hospital safety. The Corona Regional Medical Center encompasses 2 large floor plates and a basement totaling about 100,000 SF. The seismic repair involved

Posted in Tagged with: ,

Alameda Naval Air Station, FISC

A fire ravaged and destroyed a 210,000 square foot, three-story wood and concrete Hospital at the former Alameda Naval Air Station, Fleet Industrial Supply Center. This building was vacant and slated for demolition when it caught fire. The fire and

Posted in Tagged with: ,

San Jose Medical Center

Over a period of six months, Vista performed a historical building survey and hazardous materials quality assurance monitoring of pre-demolition hazardous materials abatement of nine buildings totaling over 300,000 square feet in downtown San Jose, California. These buildings include seven

Posted in Tagged with: ,

University of California Davis Medical Center

This project involved major remodel/renovations of the 3rd & 4th floors of Davis Tower at UC Davis Medical Center.  This building is a Level 1 trauma center in the Sacramento area covering >140 acres and $1.3 billion operating revenue in 2012.

Posted in Tagged with: ,

Categories